AIR Division – Temporary Roof with Multi Directional Lifting Gantries The scaffold was a temporary roof with two multi directional lifting gantries suspended from the roof. It was erected on the South Terminal F.C.C. Project in mid 2024. TONE Scaffolding also provided...
AIR Division – Heathrow Terminal 1 TONE Scaffolding were contracted to supply a temporary staircase at Heathrow Terminal 1 whilst refurbishment works were being carried out. The staircase allowed the public to access the next floor up whilst the original staircase was...
AIR Division – Gatwick Pier 5 TONE Scaffolding were contracted to supply scaffolding to assist in the Gatwick Pier 5 Reconfiguration Project, turning Pier 5 in the North terminal from one storey to two storeys. The scaffolds were required for loading gantries for...
AIR Division – Gatwick Lift Shaft TONE Scaffolding provided a protection scaffold for a project at Gatwick Airport. TONE erected the scaffold and clad it in Protect Panels to ensure that the demolition works that were happening did not adversely affect the public....
AIR Division – Gatwick Immigration Hall When the Gatwick Immigration Hall ceiling became contaminated with asbestos, TONE Scaffolding were contracted to supply a sealed working platform below the ceiling for removal and replacement works. TONE clad the beam work in...