The existing office building at Building 820, Heathrow Terminal 3, is currently undergoing conversion to accommodate the increasing number of contractors working at the airport. The facility will serve as a welfare space, providing essential amenities to support site operations.
The TONE Scaffolding team was tasked with installing full roof edge protection around the perimeter of the main roof and above the plant room to ensure worker safety at height. To aid in manual handling and reduce risks, all required materials were craned directly onto the roof.
On the rooftop, we erected two system staircases to provide safe access to the area above the plant room. In addition, we installed two emergency escape system staircases, ensuring safe egress from the roof in case of an emergency. These are critical due to the primary access being via internal staircases and lifts.